Master-Slave Constraints
Using zero/one variables, we can control the range of values that other variables take. Suppose that

(the amount shipped from

to

) is either 0 (we don't ship from

to

) or between 20 and 100 (we ship from

to

with limits specified by the transportation company). We introduce a new binary (0-1) variable

that is 1 if there is a shipment from

to

and 0 otherwise. Then we can use
master-slave constraints to let

control