|*FORM FIELD ExtraForExperts*|ExtraForExperts|This problem is similar to the Cosmic Computers Problem, but the facility location is a little different. Rather than face a decision about whether to build a plant or not, we need to determine what type of plant to build. This gives rise to the following variable:
While solving the Coke Supply Chain Problem, the expression
will often be fractional. This means that the capacity of the plant
where is the capacity of a plant of size will be between the capacities of two different size plants, e.g., 280 kT/yr is between 225 kT/yr plant and a 300 kT/yr plant. We could use constraints to remove the fractionality, e.g.,
These branches will ensure plants have the right capacities, but will still not resolve fractionalities in the . However, if we want the capacity of plant to be 225, then we can remove all the that allow for the capacity to be larger than 225:
Conversely, if we want to branch up, i.e., the capacity is 300, then we can remove all the that allow the capacity to be smaller than 300:
Note For these branches to work properly, the possibility of building no plant must be modeled as building a plant with no capacity (i.e., = 0) for no cost.
| | |
< < | |*FORM FIELD StudentTasks*|StudentTasks|
- Write AMPL model, data and script files (
coke.mod , coke.dat and coke.run respectively) to solve the Coke Production Problem. Write a management summary for your solution.
What to hand in Your 3 AMPL files. Your management summary.
- Experts Only Solve the LP relaxation of the Coke Supply Chain Problem integer programme. Using the branches described in Extra for Experts, use AMPL to perform branching on at least 4 nodes and draw the resulting branch-and-bound tree.
Hint See Extra for Experts in the Cosmic ComputersProblem for an example of constraint branching.
What to hand in Your AMPL code for implementing the branches. Your drawing of your branch-and-bound tree.
| | > > | |*FORM FIELD StudentTasks*|StudentTasks|
- Write AMPL model, data and script files (
coke.mod , coke.dat and coke.run respectively) to solve the Coke Production Problem. Write a management summary for your solution.
What to hand in Your 3 AMPL files. Your management summary.
- Experts Only Solve the LP relaxation of the Coke Supply Chain Problem integer programme. Using the branches described in Extra for Experts, use AMPL to perform branching on at least 4 nodes and draw the resulting branch-and-bound tree.
Hint See Extra for Experts in the Cosmic ComputersProblem for an example of constraint branching in AMPL.
What to hand in Your AMPL code for implementing the branches. Your drawing of your branch-and-bound tree.
| | |
META FILEATTACHMENT |
attachment="800px-Koks_Brennstoff.jpg" attr="h" comment="" date="1203500128" name="800px-Koks_Brennstoff.jpg" path="C:\Users\Lauren Jackson\Documents\Desktop\Desktop stuff\Twiki\Twiki images\CokeProduction\800px-Koks_Brennstoff.jpg" size="77315" stream="C:\Users\Lauren Jackson\Documents\Desktop\Desktop stuff\Twiki\Twiki images\CokeProduction\800px-Koks_Brennstoff.jpg" tmpFilename="" user="LaurenJackson" version="1" |
META FILEATTACHMENT |
attachment="coke_map.jpg" attr="h" comment="" date="1203500160" name="coke_map.jpg" path="C:\Users\Lauren Jackson\Documents\Desktop\Desktop stuff\Twiki\Twiki images\CokeProduction\coke_map.jpg" size="43023" stream="C:\Users\Lauren Jackson\Documents\Desktop\Desktop stuff\Twiki\Twiki images\CokeProduction\coke_map.jpg" tmpFilename="" user="LaurenJackson" version="1" |
META FILEATTACHMENT |
attachment="latex6f834a945dc2e3c23f04a7ab04dfd506.png" attr="h" comment="" date="1208933146" name="latex6f834a945dc2e3c23f04a7ab04dfd506.png" stream="GLOB(0xa3aeab4)" tmpFilename="latex6f834a945dc2e3c23f04a7ab04dfd506.png" user="MichaelOSullivan" version="1" |
|
|
META TOPICPARENT |
name="SubmitCaseStudy" |
<-- Under Construction --> | |
META FORM |
name="OpsRes.CaseStudyForm" |
| |
< < |
FORM FIELD Title |
Title |
The Coke Supply Chain |
| > > |
FORM FIELD Title |
Title |
The Coke Supply Chain Problem |
| |
| |
< < |
| > > |
| |
| |
< < | |*FORM FIELD ProblemDescription*|ProblemDescription|*THE COKE PRODUCTION PROBLEM*
Adapted from a real-world problem
Over 29% of world's coke is made in China. Recently market liberalization has lead to town and village enterprises, with uncertainty in future markets resulting in short-sighted resource use. There are currently many small cokemaking plants with relatively primitive technology. This has resulted in an industry with low transportation costs (as coke is supplied by many small local producers) but high pollution and energy use.
Figure 1 Coke en.wikipedia.org/wiki/Image:Koks_Brennstoff.jpg
The government wants to move cokemaking to Shanxi, where they can establish bigger facilities. This plan will be more efficient, with less pollution, but will also result in higher transport costs (calculated from a GIS database). The plants in Shanxi will be built with one or more oven batteries, each making 75,000 tonnes of coke a year. The process these plants will use to convert coal to coke is "thermal decomposition". This process results in 1 tonne of coke produced for every 1.3 tonnes of coal processed.
The (simplified) problem we will model has the following details:
- There are six coal mines, each able to supply up to a certain amount of coal each year to the plants for processing
- There are six customers, each with a certain demand for coke each year
- There are six possible plant locations, each able to process a certain amount of coke each year
Each plant has 6 possible sizes, with coke processing levels and associated construction costs shown below:
Size |
Cost |
(kT/yr) |
(MRMB) |
75 |
4.4 |
150 |
7.4 |
225 |
10.5 |
300 |
13.5 |
375 |
16.5 |
450 |
19.6 |
Each Mine has the following coal supply per year:
Mine |
1 |
2 |
3 |
4 |
5 |
6 |
Coal Supply (kT/yr) |
25.8 |
728 |
1456 |
40 |
36.9 |
1100 |
Each Customer has the following coke demand per year:
Customer |
1 |
2 |
3 |
4 |
5 |
6 |
Coke Demand (kT/yr) |
83 |
5.5 |
6.975 |
5.5 |
720.75 |
5.5 |
The transportation costs (RMB/kT) between the mines and the
plants are as follows:
RMB/kT |
Plant 1 |
Plant 2 |
Plant 3 |
Plant 4 |
Plant 5 |
Plant 6 |
Mine 1 |
231737 |
46813 |
79337 |
195845 |
103445 |
45186 |
Mine 2 |
179622 |
267996 |
117602 |
200298 |
128184 |
49046 |
Mine 3 |
45170 |
93159 |
156241 |
218655 |
103802 |
119616 |
Mine 4 |
149925 |
254305 |
76423 |
123534 |
151784 |
104081 |
Mine 5 |
152301 |
205126 |
24321 |
66187 |
195559 |
88979 |
Mine 6 |
223934 |
132391 |
51004 |
122329 |
222927 |
54357 |
The transportation costs (RMB/kT) between the plants and the customers are as follows:
RMB/kT |
Plant 1 |
Plant 2 |
Plant 3 |
Plant 4 |
Plant 5 |
Plant 6 |
Customer 1 |
6736 |
42658 |
70414 |
45170 |
184679 |
111569 |
Customer 2 |
217266 |
227190 |
249640 |
203029 |
153531 |
117487 |
Customer 3 |
35936 |
28768 |
126316 |
2498 |
130317 |
74034 |
Customer 4 |
73446 |
52077 |
108368 |
75011 |
49827 |
62850 |
Customer 5 |
174664 |
177461 |
151589 |
153300 |
59916 |
135162 |
Customer 6 |
186302 |
189099 |
147026 |
164938 |
149836 |
286307 |
|
| > > | |*FORM FIELD ProblemDescription*|ProblemDescription|*THE COKE PRODUCTION PROBLEM*
Adapted from a real-world problem
Over 29% of world's coke is made in China. Recently market liberalization has lead to town and village enterprises, with uncertainty in future markets resulting in short-sighted resource use. There are currently many small cokemaking plants with relatively primitive technology. This has resulted in an industry with low transportation costs (as coke is supplied by many small local producers) but high pollution and energy use.
Figure 1 Coke from en.wikipedia.org/wiki/Image:Koks_Brennstoff.jpg
The government wants to move cokemaking to Shanxi, where they can establish bigger facilities. This plan will be more efficient, with less pollution, but will also result in higher transport costs (calculated from a GIS database). The plants in Shanxi will be built with one or more oven batteries, each making 75,000 tonnes of coke a year. The process these plants will use to convert coal to coke is "thermal decomposition". This process results in 1 tonne of coke produced for every 1.3 tonnes of coal processed.
The (simplified) problem we will model has the following details:
- There are six coal mines, each able to supply up to a certain amount of coal each year to the plants for processing
- There are six customers, each with a certain demand for coke each year
- There are six possible plant locations, each able to process a certain amount of coke each year
Each plant has 6 possible sizes, with coke processing levels and associated construction costs shown below:
Size |
Cost |
(kT/yr) |
(MRMB) |
75 |
4.4 |
150 |
7.4 |
225 |
10.5 |
300 |
13.5 |
375 |
16.5 |
450 |
19.6 |
Each Mine has the following coal supply per year:
Mine |
1 |
2 |
3 |
4 |
5 |
6 |
Coal Supply (kT/yr) |
25.8 |
728 |
1456 |
40 |
36.9 |
1100 |
Each Customer has the following coke demand per year:
Customer |
1 |
2 |
3 |
4 |
5 |
6 |
Coke Demand (kT/yr) |
83 |
5.5 |
6.975 |
5.5 |
720.75 |
5.5 |
The transportation costs (RMB/kT) between the mines and the
plants are as follows:
RMB/kT |
Plant 1 |
Plant 2 |
Plant 3 |
Plant 4 |
Plant 5 |
Plant 6 |
Mine 1 |
231737 |
46813 |
79337 |
195845 |
103445 |
45186 |
Mine 2 |
179622 |
267996 |
117602 |
200298 |
128184 |
49046 |
Mine 3 |
45170 |
93159 |
156241 |
218655 |
103802 |
119616 |
Mine 4 |
149925 |
254305 |
76423 |
123534 |
151784 |
104081 |
Mine 5 |
152301 |
205126 |
24321 |
66187 |
195559 |
88979 |
Mine 6 |
223934 |
132391 |
51004 |
122329 |
222927 |
54357 |
The transportation costs (RMB/kT) between the plants and the customers are as follows:
RMB/kT |
Plant 1 |
Plant 2 |
Plant 3 |
Plant 4 |
Plant 5 |
Plant 6 |
Customer 1 |
6736 |
42658 |
70414 |
45170 |
184679 |
111569 |
Customer 2 |
217266 |
227190 |
249640 |
203029 |
153531 |
117487 |
Customer 3 |
35936 |
28768 |
126316 |
2498 |
130317 |
74034 |
Customer 4 |
73446 |
52077 |
108368 |
75011 |
49827 |
62850 |
Customer 5 |
174664 |
177461 |
151589 |
153300 |
59916 |
135162 |
Customer 6 |
186302 |
189099 |
147026 |
164938 |
149836 |
286307 |
|
| |
| |
< < |
|*FORM FIELD StudentTasks*|StudentTasks|*STUDENT TASKS*
1. Write AMPL model, data and script files ( coke.mod , coke.dat and coke.run respectively) to solve The Coke Production Problem. Write a management summary for your solution.
What to hand in Your 3 AMPL files. Your management summary.
Extra for Experts' Tasks
1. In The Coke Production Problem the capacity of a plant is given by the sum (over all the different plant sizes) of the plant processing capacity multiplied by the binary variable indicating if that size plant will be constructed, e.g., sum {s in SIZES} Capacity[s] * Build[p, s] gives the capacity of plant p . Since the plants can only have certain capacity levels (corresponding to the plants) we can branch on the plant capacity expression, e.g.,
# This constraint ensures the capacity of Plant 1 is at least 225 kT/yr,
# i.e., a plant of size 3, 4, 5, or 6
subject to Up :
sum {s in SIZES} Capacity[s] * Build['Plant 1', s] >= 225000;
These branches are another type of constraint branch. Implement 3 of these constraint branches starting at the root node, i.e., the LP relaxation solution. Make sure you check both sides of the branch, e.g.,
# This constraint ensures the capacity of Plant 1 is at least 225 kT/yr,
# i.e., a plant of size 3, 4, 5, or 6
subject to Up :
sum {s in SIZES} Capacity[s] * Build['Plant 1', s] >= 225000;
and
# This constraint ensures the capacity of Plant 1 is at most 150 kT/yr,
# i.e., a plant of size 1 or 2
subject to Down :
sum {s in SIZES} Capacity[s] * Build['Plant 1', s] <= 150000;
Draw the branch-and-bound tree created by your branches.
What to hand in Your AMPL code for implementing the branches. Your drawing of your branch-and-bound tree.
| | > > | |*FORM FIELD ExtraForExperts*|ExtraForExperts|This problem is similar to the Cosmic Computers Problem, but the facility location is a little different. Rather than face a decision about whether to build a plant or not, we need to determine what type of plant to build. This gives rise to the following variable:
While solving the Coke Supply Chain Problem, the expression
will often be fractional. This means that the capacity of the plant
where is the capacity of a plant of size will be between the capacities of two different size plants, e.g., 280 kT/yr is between 225 kT/yr plant and a 300 kT/yr plant. We could use constraints to remove the fractionality, e.g.,
These branches will ensure plants have the right capacities, but will still not resolve fractionalities in the . However, if we want the capacity of plant to be 225, then we can remove all the that allow for the capacity to be larger than 225:
Conversely, if we want to branch up, i.e., the capacity is 300, then we can remove all the that allow the capacity to be smaller than 300:
Note For these branches to work properly, the possibility of building no plant must be modeled as building a plant with no capacity (i.e., = 0) for no cost.
|
|*FORM FIELD StudentTasks*|StudentTasks|
- Write AMPL model, data and script files (
coke.mod , coke.dat and coke.run respectively) to solve the Coke Production Problem. Write a management summary for your solution.
What to hand in Your 3 AMPL files. Your management summary.
- Experts Only Solve the LP relaxation of the Coke Supply Chain Problem integer programme. Using the branches described in Extra for Experts, use AMPL to perform branching on at least 4 nodes and draw the resulting branch-and-bound tree.
Hint See Extra for Experts in the Cosmic ComputersProblem for an example of constraint branching.
What to hand in Your AMPL code for implementing the branches. Your drawing of your branch-and-bound tree.
| | |
META FILEATTACHMENT |
attachment="800px-Koks_Brennstoff.jpg" attr="h" comment="" date="1203500128" name="800px-Koks_Brennstoff.jpg" path="C:\Users\Lauren Jackson\Documents\Desktop\Desktop stuff\Twiki\Twiki images\CokeProduction\800px-Koks_Brennstoff.jpg" size="77315" stream="C:\Users\Lauren Jackson\Documents\Desktop\Desktop stuff\Twiki\Twiki images\CokeProduction\800px-Koks_Brennstoff.jpg" tmpFilename="" user="LaurenJackson" version="1" |
META FILEATTACHMENT |
attachment="coke_map.jpg" attr="h" comment="" date="1203500160" name="coke_map.jpg" path="C:\Users\Lauren Jackson\Documents\Desktop\Desktop stuff\Twiki\Twiki images\CokeProduction\coke_map.jpg" size="43023" stream="C:\Users\Lauren Jackson\Documents\Desktop\Desktop stuff\Twiki\Twiki images\CokeProduction\coke_map.jpg" tmpFilename="" user="LaurenJackson" version="1" |
| |
> > |
META FILEATTACHMENT |
attachment="latex6f834a945dc2e3c23f04a7ab04dfd506.png" attr="h" comment="" date="1208933146" name="latex6f834a945dc2e3c23f04a7ab04dfd506.png" stream="GLOB(0xa3aeab4)" tmpFilename="latex6f834a945dc2e3c23f04a7ab04dfd506.png" user="MichaelOSullivan" version="1" |
META FILEATTACHMENT |
attachment="latexf59c8c028fb191d065d6a20fa8b58ad4.png" attr="h" comment="" date="1208933147" name="latexf59c8c028fb191d065d6a20fa8b58ad4.png" stream="GLOB(0xa2dfe64)" tmpFilename="latexf59c8c028fb191d065d6a20fa8b58ad4.png" user="MichaelOSullivan" version="1" |
META FILEATTACHMENT |
attachment="latexc1aa8902c98c0ae0732323a987ba2bd9.png" attr="h" comment="" date="1208933147" name="latexc1aa8902c98c0ae0732323a987ba2bd9.png" stream="GLOB(0xa2e0188)" tmpFilename="latexc1aa8902c98c0ae0732323a987ba2bd9.png" user="MichaelOSullivan" version="1" |
META FILEATTACHMENT |
attachment="latexdcf1fc59557e250eed061a8c02867d44.png" attr="h" comment="" date="1208934097" name="latexdcf1fc59557e250eed061a8c02867d44.png" stream="GLOB(0xacc2594)" tmpFilename="latexdcf1fc59557e250eed061a8c02867d44.png" user="MichaelOSullivan" version="1" |
META FILEATTACHMENT |
attachment="latexfb492a77be777564ce3f1e7425e408e4.png" attr="h" comment="" date="1208934097" name="latexfb492a77be777564ce3f1e7425e408e4.png" stream="GLOB(0xabb95e8)" tmpFilename="latexfb492a77be777564ce3f1e7425e408e4.png" user="MichaelOSullivan" version="1" |
META FILEATTACHMENT |
attachment="latex813faf7551d19e746040859b8af4d580.png" attr="h" comment="" date="1208934098" name="latex813faf7551d19e746040859b8af4d580.png" stream="GLOB(0xabb152c)" tmpFilename="latex813faf7551d19e746040859b8af4d580.png" user="MichaelOSullivan" version="1" |
META FILEATTACHMENT |
attachment="latex249fcba5b94268daac8961654756a25c.png" attr="h" comment="" date="1208934098" name="latex249fcba5b94268daac8961654756a25c.png" stream="GLOB(0xabb18c8)" tmpFilename="latex249fcba5b94268daac8961654756a25c.png" user="MichaelOSullivan" version="1" |
META FILEATTACHMENT |
attachment="latex75ebf9389b5be72af0360b24bca5adee.png" attr="h" comment="" date="1208934098" name="latex75ebf9389b5be72af0360b24bca5adee.png" stream="GLOB(0xabb1850)" tmpFilename="latex75ebf9389b5be72af0360b24bca5adee.png" user="MichaelOSullivan" version="1" |
META FILEATTACHMENT |
attachment="latex3aea7233589aa721f711db94f601349b.png" attr="h" comment="" date="1208934098" name="latex3aea7233589aa721f711db94f601349b.png" stream="GLOB(0xabb17d8)" tmpFilename="latex3aea7233589aa721f711db94f601349b.png" user="MichaelOSullivan" version="1" |
META FILEATTACHMENT |
attachment="latex7af89fb055fd3b92240c2285dbbe8111.png" attr="h" comment="" date="1208934098" name="latex7af89fb055fd3b92240c2285dbbe8111.png" stream="GLOB(0xabb1afc)" tmpFilename="latex7af89fb055fd3b92240c2285dbbe8111.png" user="MichaelOSullivan" version="1" |
META FILEATTACHMENT |
attachment="latex65cd373241df8f5af7efc94023eda61a.png" attr="h" comment="" date="1208934098" name="latex65cd373241df8f5af7efc94023eda61a.png" stream="GLOB(0xabb1c88)" tmpFilename="latex65cd373241df8f5af7efc94023eda61a.png" user="MichaelOSullivan" version="1" |
META FILEATTACHMENT |
attachment="latex32fc80ae026cf4d1f4099205fde096f0.png" attr="h" comment="" date="1208934098" name="latex32fc80ae026cf4d1f4099205fde096f0.png" stream="GLOB(0xacc236c)" tmpFilename="latex32fc80ae026cf4d1f4099205fde096f0.png" user="MichaelOSullivan" version="1" |
| |
META TOPICMOVED |
by="MichaelOSullivan" date="1204454747" from="OpsRes.CokeProduction" to="OpsRes.CokeSupplyChain" |
|
|
META TOPICPARENT |
name="SubmitCaseStudy" |
<-- Under Construction --> | |
| |
< < | |*FORM FIELD ProblemDescription*|ProblemDescription|*THE COKE PRODUCTION PROBLEM*
Adapted from a real-world problem
Over 29% of world's coke is made in China. Recently market liberalization has lead to town and village enterprises, with uncertainty in future markets resulting in short-sighted resource use. There are currently many small cokemaking plants with relatively primitive technology. This has resulted in an industry with low transportation costs (as coke is supplied by many small local producers) but high pollution and energy use.
Figure 1 Coke: [https://en.wikipedia.org/wiki/Image:Koks_Brennstoff.jpg][https://en.wikipedia.org/wiki/Image:Koks_Brennstoff.jpg]]
The government wants to move cokemaking to Shanxi, where they can establish bigger facilities. This plan will be more efficient, with less pollution, but will also result in higher transport costs (calculated from a GIS database). The plants in Shanxi will be built with one or more oven batteries, each making 75,000 tonnes of coke a year. The process these plants will use to convert coal to coke is "thermal decomposition". This process results in 1 tonne of coke produced for every 1.3 tonnes of coal processed.
The (simplified) problem we will model has the following details:
- There are six coal mines, each able to supply up to a certain amount of coal each year to the plants for processing
- There are six customers, each with a certain demand for coke each year
- There are six possible plant locations, each able to process a certain amount of coke each year
Each plant has 6 possible sizes, with coke processing levels and associated construction costs shown below:
Size |
Cost |
(kT/yr) |
(MRMB) |
75 |
4.4 |
150 |
7.4 |
225 |
10.5 |
300 |
13.5 |
375 |
16.5 |
450 |
19.6 |
Each Mine has the following coal supply per year:
Mine |
1 |
2 |
3 |
4 |
5 |
6 |
Coal Supply (kT/yr) |
25.8 |
728 |
1456 |
40 |
36.9 |
1100 |
Each Customer has the following coke demand per year:
Customer |
1 |
2 |
3 |
4 |
5 |
6 |
Coke Demand (kT/yr) |
83 |
5.5 |
6.975 |
5.5 |
720.75 |
5.5 |
The transportation costs (RMB/kT) between the mines and the
plants are as follows:
RMB/kT |
Plant 1 |
Plant 2 |
Plant 3 |
Plant 4 |
Plant 5 |
Plant 6 |
Mine 1 |
231737 |
46813 |
79337 |
195845 |
103445 |
45186 |
Mine 2 |
179622 |
267996 |
117602 |
200298 |
128184 |
49046 |
Mine 3 |
45170 |
93159 |
156241 |
218655 |
103802 |
119616 |
Mine 4 |
149925 |
254305 |
76423 |
123534 |
151784 |
104081 |
Mine 5 |
152301 |
205126 |
24321 |
66187 |
195559 |
88979 |
Mine 6 |
223934 |
132391 |
51004 |
122329 |
222927 |
54357 |
The transportation costs (RMB/kT) between the plants and the customers are as follows:
RMB/kT |
Plant 1 |
Plant 2 |
Plant 3 |
Plant 4 |
Plant 5 |
Plant 6 |
Customer 1 |
6736 |
42658 |
70414 |
45170 |
184679 |
111569 |
Customer 2 |
217266 |
227190 |
249640 |
203029 |
153531 |
117487 |
Customer 3 |
35936 |
28768 |
126316 |
2498 |
130317 |
74034 |
Customer 4 |
73446 |
52077 |
108368 |
75011 |
49827 |
62850 |
Customer 5 |
174664 |
177461 |
151589 |
153300 |
59916 |
135162 |
Customer 6 |
186302 |
189099 |
147026 |
164938 |
149836 |
286307 |
|
| > > | |*FORM FIELD ProblemDescription*|ProblemDescription|*THE COKE PRODUCTION PROBLEM*
Adapted from a real-world problem
Over 29% of world's coke is made in China. Recently market liberalization has lead to town and village enterprises, with uncertainty in future markets resulting in short-sighted resource use. There are currently many small cokemaking plants with relatively primitive technology. This has resulted in an industry with low transportation costs (as coke is supplied by many small local producers) but high pollution and energy use.
Figure 1 Coke en.wikipedia.org/wiki/Image:Koks_Brennstoff.jpg
The government wants to move cokemaking to Shanxi, where they can establish bigger facilities. This plan will be more efficient, with less pollution, but will also result in higher transport costs (calculated from a GIS database). The plants in Shanxi will be built with one or more oven batteries, each making 75,000 tonnes of coke a year. The process these plants will use to convert coal to coke is "thermal decomposition". This process results in 1 tonne of coke produced for every 1.3 tonnes of coal processed.
The (simplified) problem we will model has the following details:
- There are six coal mines, each able to supply up to a certain amount of coal each year to the plants for processing
- There are six customers, each with a certain demand for coke each year
- There are six possible plant locations, each able to process a certain amount of coke each year
Each plant has 6 possible sizes, with coke processing levels and associated construction costs shown below:
Size |
Cost |
(kT/yr) |
(MRMB) |
75 |
4.4 |
150 |
7.4 |
225 |
10.5 |
300 |
13.5 |
375 |
16.5 |
450 |
19.6 |
Each Mine has the following coal supply per year:
Mine |
1 |
2 |
3 |
4 |
5 |
6 |
Coal Supply (kT/yr) |
25.8 |
728 |
1456 |
40 |
36.9 |
1100 |
Each Customer has the following coke demand per year:
Customer |
1 |
2 |
3 |
4 |
5 |
6 |
Coke Demand (kT/yr) |
83 |
5.5 |
6.975 |
5.5 |
720.75 |
5.5 |
The transportation costs (RMB/kT) between the mines and the
plants are as follows:
RMB/kT |
Plant 1 |
Plant 2 |
Plant 3 |
Plant 4 |
Plant 5 |
Plant 6 |
Mine 1 |
231737 |
46813 |
79337 |
195845 |
103445 |
45186 |
Mine 2 |
179622 |
267996 |
117602 |
200298 |
128184 |
49046 |
Mine 3 |
45170 |
93159 |
156241 |
218655 |
103802 |
119616 |
Mine 4 |
149925 |
254305 |
76423 |
123534 |
151784 |
104081 |
Mine 5 |
152301 |
205126 |
24321 |
66187 |
195559 |
88979 |
Mine 6 |
223934 |
132391 |
51004 |
122329 |
222927 |
54357 |
The transportation costs (RMB/kT) between the plants and the customers are as follows:
RMB/kT |
Plant 1 |
Plant 2 |
Plant 3 |
Plant 4 |
Plant 5 |
Plant 6 |
Customer 1 |
6736 |
42658 |
70414 |
45170 |
184679 |
111569 |
Customer 2 |
217266 |
227190 |
249640 |
203029 |
153531 |
117487 |
Customer 3 |
35936 |
28768 |
126316 |
2498 |
130317 |
74034 |
Customer 4 |
73446 |
52077 |
108368 |
75011 |
49827 |
62850 |
Customer 5 |
174664 |
177461 |
151589 |
153300 |
59916 |
135162 |
Customer 6 |
186302 |
189099 |
147026 |
164938 |
149836 |
286307 |
|
| |
|
|
META TOPICPARENT |
name="SubmitCaseStudy" |
<-- Under Construction --> | |
| |
< < | |*FORM FIELD ProblemDescription*|ProblemDescription|*THE COKE PRODUCTION PROBLEM*
Adapted from a real-world problem
Over 29% of world’s coke is made in China. Recently market liberalization has lead to town and village enterprises, with uncertainty in future markets resulting in short-sighted resource use. There are currently many small cokemaking plants with relatively primitive technology. This has resulted in an industry with low transportation costs (as coke is supplied by many small local producers) but high pollution and energy use.
Coke Link to reference en.wikipedia.org/wiki/Image:Koks_Brennstoff.jpg
The government wants to move cokemaking to Shanxi, where they can establish bigger facilities. This plan will be more efficient, with less pollution, but will also result in higher transport costs (calculated from a GIS database). The plants in Shanxi will be built with one or more oven batteries, each making 75,000 tonnes of coke a year. The process these plants will use to convert coal to coke is "thermal decomposition". This process results in 1 tonne of coke produced for every 1.3 tonnes of coal processed.
The (simplified) problem we will model has the following details:
- There are six coal mines, each able to supply up to a certain amount of coal each year to the plants for processing
- There are six customers, each with a certain demand for coke each year
- There are six possible plant locations, each able to process a certain amount of coke each year
Each plant has 6 possible sizes, with coke processing levels and
associated construction costs shown below:
Size |
Cost |
(kT/yr) |
(MRMB) |
75 |
4.4 |
150 |
7.4 |
225 |
10.5 |
300 |
13.5 |
375 |
16.5 |
450 |
19.6 |
Each Mine has the following coal supply per year:
Mine |
1 |
2 |
3 |
4 |
5 |
6 |
Coal Supply (kT/yr) |
25.8 |
728 |
1456 |
40 |
36.9 |
1100 |
Each Customer has the following coke demand per year:
Customer |
1 |
2 |
3 |
4 |
5 |
6 |
Coke Demand (kT/yr) |
83 |
5.5 |
6.975 |
5.5 |
720.75 |
5.5 |
The transportation costs (RMB/kT) between the mines and the
plants are as follows:
RMB/kT |
Plant 1 |
Plant 2 |
Plant 3 |
Plant 4 |
Plant 5 |
Plant 6 |
Mine 1 |
231737 |
46813 |
79337 |
195845 |
103445 |
45186 |
Mine 2 |
179622 |
267996 |
117602 |
200298 |
128184 |
49046 |
Mine 3 |
45170 |
93159 |
156241 |
218655 |
103802 |
119616 |
Mine 4 |
149925 |
254305 |
76423 |
123534 |
151784 |
104081 |
Mine 5 |
152301 |
205126 |
24321 |
66187 |
195559 |
88979 |
Mine 6 |
223934 |
132391 |
51004 |
122329 |
222927 |
54357 |
The transportation costs (RMB/kT) between the plants and the
customers are as follows:
RMB/kT |
Plant 1 |
Plant 2 |
Plant 3 |
Plant 4 |
Plant 5 |
Plant 6 |
Customer 1 |
6736 |
42658 |
70414 |
45170 |
184679 |
111569 |
Customer 2 |
217266 |
227190 |
249640 |
203029 |
153531 |
117487 |
Customer 3 |
35936 |
28768 |
126316 |
2498 |
130317 |
74034 |
Customer 4 |
73446 |
52077 |
108368 |
75011 |
49827 |
62850 |
Customer 5 |
174664 |
177461 |
151589 |
153300 |
59916 |
135162 |
Customer 6 |
186302 |
189099 |
147026 |
164938 |
149836 |
286307 |
|
| > > | |*FORM FIELD ProblemDescription*|ProblemDescription|*THE COKE PRODUCTION PROBLEM*
Adapted from a real-world problem
Over 29% of world's coke is made in China. Recently market liberalization has lead to town and village enterprises, with uncertainty in future markets resulting in short-sighted resource use. There are currently many small cokemaking plants with relatively primitive technology. This has resulted in an industry with low transportation costs (as coke is supplied by many small local producers) but high pollution and energy use.
Figure 1 Coke: [https://en.wikipedia.org/wiki/Image:Koks_Brennstoff.jpg][https://en.wikipedia.org/wiki/Image:Koks_Brennstoff.jpg]]
The government wants to move cokemaking to Shanxi, where they can establish bigger facilities. This plan will be more efficient, with less pollution, but will also result in higher transport costs (calculated from a GIS database). The plants in Shanxi will be built with one or more oven batteries, each making 75,000 tonnes of coke a year. The process these plants will use to convert coal to coke is "thermal decomposition". This process results in 1 tonne of coke produced for every 1.3 tonnes of coal processed.
The (simplified) problem we will model has the following details:
- There are six coal mines, each able to supply up to a certain amount of coal each year to the plants for processing
- There are six customers, each with a certain demand for coke each year
- There are six possible plant locations, each able to process a certain amount of coke each year
Each plant has 6 possible sizes, with coke processing levels and associated construction costs shown below:
Size |
Cost |
(kT/yr) |
(MRMB) |
75 |
4.4 |
150 |
7.4 |
225 |
10.5 |
300 |
13.5 |
375 |
16.5 |
450 |
19.6 |
Each Mine has the following coal supply per year:
Mine |
1 |
2 |
3 |
4 |
5 |
6 |
Coal Supply (kT/yr) |
25.8 |
728 |
1456 |
40 |
36.9 |
1100 |
Each Customer has the following coke demand per year:
Customer |
1 |
2 |
3 |
4 |
5 |
6 |
Coke Demand (kT/yr) |
83 |
5.5 |
6.975 |
5.5 |
720.75 |
5.5 |
The transportation costs (RMB/kT) between the mines and the
plants are as follows:
RMB/kT |
Plant 1 |
Plant 2 |
Plant 3 |
Plant 4 |
Plant 5 |
Plant 6 |
Mine 1 |
231737 |
46813 |
79337 |
195845 |
103445 |
45186 |
Mine 2 |
179622 |
267996 |
117602 |
200298 |
128184 |
49046 |
Mine 3 |
45170 |
93159 |
156241 |
218655 |
103802 |
119616 |
Mine 4 |
149925 |
254305 |
76423 |
123534 |
151784 |
104081 |
Mine 5 |
152301 |
205126 |
24321 |
66187 |
195559 |
88979 |
Mine 6 |
223934 |
132391 |
51004 |
122329 |
222927 |
54357 |
The transportation costs (RMB/kT) between the plants and the customers are as follows:
RMB/kT |
Plant 1 |
Plant 2 |
Plant 3 |
Plant 4 |
Plant 5 |
Plant 6 |
Customer 1 |
6736 |
42658 |
70414 |
45170 |
184679 |
111569 |
Customer 2 |
217266 |
227190 |
249640 |
203029 |
153531 |
117487 |
Customer 3 |
35936 |
28768 |
126316 |
2498 |
130317 |
74034 |
Customer 4 |
73446 |
52077 |
108368 |
75011 |
49827 |
62850 |
Customer 5 |
174664 |
177461 |
151589 |
153300 |
59916 |
135162 |
Customer 6 |
186302 |
189099 |
147026 |
164938 |
149836 |
286307 |
|
| |
|
|
META TOPICPARENT |
name="SubmitCaseStudy" |
<-- Under Construction --> | |
--> | |
< < | %BEGINLATEXPREAMBLE% \usepackage{amsmath} | > > | %BEGINLATEXPREAMBLE%
\usepackage{amsmath} | | %ENDLATEXPREAMBLE%
Case Study: The Coke Supply Chain Problem | |
Return to top | |
< < | Computational Model | > > | Computational Model | |
The computational model... | |
Return to top | |
< < | Results | > > | Results | |
The results... | |
Return to top | |
< < | Conclusions | > > | Conclusions | |
In conclusion... |
|
META TOPICPARENT |
name="SubmitCaseStudy" |
<-- Under Construction --> | |
META FORM |
name="OpsRes.CaseStudyForm" |
| |
< < |
| > > |
FORM FIELD Title |
Title |
The Coke Supply Chain |
| |
| | |*FORM FIELD StudentTasks*|StudentTasks|*STUDENT TASKS*
1. Write AMPL model, data and script files ( coke.mod , coke.dat and coke.run respectively) to solve The Coke Production Problem. Write a management summary for your solution.
What to hand in Your 3 AMPL files. Your management summary.
Extra for Experts' Tasks
1. In The Coke Production Problem the capacity of a plant is given by the sum (over all the different plant sizes) of the plant processing capacity multiplied by the binary variable indicating if that size plant will be constructed, e.g., sum {s in SIZES} Capacity[s] * Build[p, s] gives the capacity of plant p . Since the plants can only have certain capacity levels (corresponding to the plants) we can branch on the plant capacity expression, e.g.,
# This constraint ensures the capacity of Plant 1 is at least 225 kT/yr,
# i.e., a plant of size 3, 4, 5, or 6
subject to Up :
sum {s in SIZES} Capacity[s] * Build['Plant 1', s] >= 225000;
These branches are another type of constraint branch. Implement 3 of these constraint branches starting at the root node, i.e., the LP relaxation solution. Make sure you check both sides of the branch, e.g.,
# This constraint ensures the capacity of Plant 1 is at least 225 kT/yr,
# i.e., a plant of size 3, 4, 5, or 6
subject to Up :
sum {s in SIZES} Capacity[s] * Build['Plant 1', s] >= 225000;
and
# This constraint ensures the capacity of Plant 1 is at most 150 kT/yr,
# i.e., a plant of size 1 or 2
subject to Down :
sum {s in SIZES} Capacity[s] * Build['Plant 1', s] <= 150000;
Draw the branch-and-bound tree created by your branches.
What to hand in Your AMPL code for implementing the branches. Your drawing of your branch-and-bound tree.
|
META FILEATTACHMENT |
attachment="800px-Koks_Brennstoff.jpg" attr="h" comment="" date="1203500128" name="800px-Koks_Brennstoff.jpg" path="C:\Users\Lauren Jackson\Documents\Desktop\Desktop stuff\Twiki\Twiki images\CokeProduction\800px-Koks_Brennstoff.jpg" size="77315" stream="C:\Users\Lauren Jackson\Documents\Desktop\Desktop stuff\Twiki\Twiki images\CokeProduction\800px-Koks_Brennstoff.jpg" tmpFilename="" user="LaurenJackson" version="1" |
META FILEATTACHMENT |
attachment="coke_map.jpg" attr="h" comment="" date="1203500160" name="coke_map.jpg" path="C:\Users\Lauren Jackson\Documents\Desktop\Desktop stuff\Twiki\Twiki images\CokeProduction\coke_map.jpg" size="43023" stream="C:\Users\Lauren Jackson\Documents\Desktop\Desktop stuff\Twiki\Twiki images\CokeProduction\coke_map.jpg" tmpFilename="" user="LaurenJackson" version="1" |
| |
> > |
META TOPICMOVED |
by="MichaelOSullivan" date="1204454747" from="OpsRes.CokeProduction" to="OpsRes.CokeSupplyChain" |
|
|
META TOPICPARENT |
name="SubmitCaseStudy" |
<-- Under Construction --> | |
| |
< < |
| > > |
| | |*FORM FIELD ProblemDescription*|ProblemDescription|*THE COKE PRODUCTION PROBLEM*
Adapted from a real-world problem
Over 29% of world’s coke is made in China. Recently market liberalization has lead to town and village enterprises, with uncertainty in future markets resulting in short-sighted resource use. There are currently many small cokemaking plants with relatively primitive technology. This has resulted in an industry with low transportation costs (as coke is supplied by many small local producers) but high pollution and energy use.
Coke Link to reference en.wikipedia.org/wiki/Image:Koks_Brennstoff.jpg
The government wants to move cokemaking to Shanxi, where they can establish bigger facilities. This plan will be more efficient, with less pollution, but will also result in higher transport costs (calculated from a GIS database). The plants in Shanxi will be built with one or more oven batteries, each making 75,000 tonnes of coke a year. The process these plants will use to convert coal to coke is "thermal decomposition". This process results in 1 tonne of coke produced for every 1.3 tonnes of coal processed.
The (simplified) problem we will model has the following details:
- There are six coal mines, each able to supply up to a certain amount of coal each year to the plants for processing
- There are six customers, each with a certain demand for coke each year
- There are six possible plant locations, each able to process a certain amount of coke each year
Each plant has 6 possible sizes, with coke processing levels and
associated construction costs shown below:
Size |
Cost |
(kT/yr) |
(MRMB) |
75 |
4.4 |
150 |
7.4 |
225 |
10.5 |
300 |
13.5 |
375 |
16.5 |
450 |
19.6 |
Each Mine has the following coal supply per year:
Mine |
1 |
2 |
3 |
4 |
5 |
6 |
Coal Supply (kT/yr) |
25.8 |
728 |
1456 |
40 |
36.9 |
1100 |
Each Customer has the following coke demand per year:
Customer |
1 |
2 |
3 |
4 |
5 |
6 |
Coke Demand (kT/yr) |
83 |
5.5 |
6.975 |
5.5 |
720.75 |
5.5 |
The transportation costs (RMB/kT) between the mines and the
plants are as follows:
RMB/kT |
Plant 1 |
Plant 2 |
Plant 3 |
Plant 4 |
Plant 5 |
Plant 6 |
Mine 1 |
231737 |
46813 |
79337 |
195845 |
103445 |
45186 |
Mine 2 |
179622 |
267996 |
117602 |
200298 |
128184 |
49046 |
Mine 3 |
45170 |
93159 |
156241 |
218655 |
103802 |
119616 |
Mine 4 |
149925 |
254305 |
76423 |
123534 |
151784 |
104081 |
Mine 5 |
152301 |
205126 |
24321 |
66187 |
195559 |
88979 |
Mine 6 |
223934 |
132391 |
51004 |
122329 |
222927 |
54357 |
The transportation costs (RMB/kT) between the plants and the
customers are as follows:
RMB/kT |
Plant 1 |
Plant 2 |
Plant 3 |
Plant 4 |
Plant 5 |
Plant 6 |
Customer 1 |
6736 |
42658 |
70414 |
45170 |
184679 |
111569 |
Customer 2 |
217266 |
227190 |
249640 |
203029 |
153531 |
117487 |
Customer 3 |
35936 |
28768 |
126316 |
2498 |
130317 |
74034 |
Customer 4 |
73446 |
52077 |
108368 |
75011 |
49827 |
62850 |
Customer 5 |
174664 |
177461 |
151589 |
153300 |
59916 |
135162 |
Customer 6 |
186302 |
189099 |
147026 |
164938 |
149836 |
286307 |
|
FORM FIELD ProblemFormulation |
ProblemFormulation |
The formulation... |
FORM FIELD ComputationalModel |
ComputationalModel |
The computational model... |
| |
|*FORM FIELD StudentTasks*|StudentTasks|*STUDENT TASKS*
1. Write AMPL model, data and script files ( coke.mod , coke.dat and coke.run respectively) to solve The Coke Production Problem. Write a management summary for your solution.
What to hand in Your 3 AMPL files. Your management summary.
Extra for Experts' Tasks
1. In The Coke Production Problem the capacity of a plant is given by the sum (over all the different plant sizes) of the plant processing capacity multiplied by the binary variable indicating if that size plant will be constructed, e.g., sum {s in SIZES} Capacity[s] * Build[p, s] gives the capacity of plant p . Since the plants can only have certain capacity levels (corresponding to the plants) we can branch on the plant capacity expression, e.g.,
# This constraint ensures the capacity of Plant 1 is at least 225 kT/yr,
# i.e., a plant of size 3, 4, 5, or 6
subject to Up :
sum {s in SIZES} Capacity[s] * Build['Plant 1', s] >= 225000;
These branches are another type of constraint branch. Implement 3 of these constraint branches starting at the root node, i.e., the LP relaxation solution. Make sure you check both sides of the branch, e.g.,
# This constraint ensures the capacity of Plant 1 is at least 225 kT/yr,
# i.e., a plant of size 3, 4, 5, or 6
subject to Up :
sum {s in SIZES} Capacity[s] * Build['Plant 1', s] >= 225000;
and
# This constraint ensures the capacity of Plant 1 is at most 150 kT/yr,
# i.e., a plant of size 1 or 2
subject to Down :
sum {s in SIZES} Capacity[s] * Build['Plant 1', s] <= 150000;
Draw the branch-and-bound tree created by your branches.
What to hand in Your AMPL code for implementing the branches. Your drawing of your branch-and-bound tree.
| | |
< < |
META FILEATTACHMENT |
attachment="800px-Koks_Brennstoff.jpg" attr="" comment="" date="1203500128" name="800px-Koks_Brennstoff.jpg" path="C:\Users\Lauren Jackson\Documents\Desktop\Desktop stuff\Twiki\Twiki images\CokeProduction\800px-Koks_Brennstoff.jpg" size="77315" stream="C:\Users\Lauren Jackson\Documents\Desktop\Desktop stuff\Twiki\Twiki images\CokeProduction\800px-Koks_Brennstoff.jpg" tmpFilename="" user="LaurenJackson" version="1" |
META FILEATTACHMENT |
attachment="coke_map.jpg" attr="" comment="" date="1203500160" name="coke_map.jpg" path="C:\Users\Lauren Jackson\Documents\Desktop\Desktop stuff\Twiki\Twiki images\CokeProduction\coke_map.jpg" size="43023" stream="C:\Users\Lauren Jackson\Documents\Desktop\Desktop stuff\Twiki\Twiki images\CokeProduction\coke_map.jpg" tmpFilename="" user="LaurenJackson" version="1" |
| > > |
META FILEATTACHMENT |
attachment="800px-Koks_Brennstoff.jpg" attr="h" comment="" date="1203500128" name="800px-Koks_Brennstoff.jpg" path="C:\Users\Lauren Jackson\Documents\Desktop\Desktop stuff\Twiki\Twiki images\CokeProduction\800px-Koks_Brennstoff.jpg" size="77315" stream="C:\Users\Lauren Jackson\Documents\Desktop\Desktop stuff\Twiki\Twiki images\CokeProduction\800px-Koks_Brennstoff.jpg" tmpFilename="" user="LaurenJackson" version="1" |
META FILEATTACHMENT |
attachment="coke_map.jpg" attr="h" comment="" date="1203500160" name="coke_map.jpg" path="C:\Users\Lauren Jackson\Documents\Desktop\Desktop stuff\Twiki\Twiki images\CokeProduction\coke_map.jpg" size="43023" stream="C:\Users\Lauren Jackson\Documents\Desktop\Desktop stuff\Twiki\Twiki images\CokeProduction\coke_map.jpg" tmpFilename="" user="LaurenJackson" version="1" |
|
|
META TOPICPARENT |
name="SubmitCaseStudy" |
<-- Under Construction --> | |
< < | <-- Ready to Review --> | |
|
META TOPICPARENT |
name="SubmitCaseStudy" |
<-- Under Construction --> | |
> > | <-- Ready to Review --> | |
|
META TOPICPARENT |
name="SubmitCaseStudy" |
| |
> > | <-- Under Construction --> | |
|
META TOPICPARENT |
name="SubmitCaseStudy" |
|
META TOPICPARENT |
name="SubmitCaseStudy" |
|
META TOPICPARENT |
name="SubmitCaseStudy" |
|
META TOPICPARENT |
name="SubmitCaseStudy" |
|
META TOPICPARENT |
name="SubmitCaseStudy" |
|
> > |
META TOPICPARENT |
name="SubmitCaseStudy" |
<--
This template controls both the look and functionality of case study topics.
You should not need to alter the layout, only edit the data using the form above.
Set the view and edit templates:
Comment out the next line to use the TWiki default view
Comment out the next line to use the TWiki default edit
-->
<--
This topic can only be changed by:
-->
Case Study: The Coke Supply Chain Problem
Submitted: 20 Feb 2008
Application Areas: Logistics, Industrial Planning, Fuel Manufacturing
Contents
Problem Description
Adapted from a real-world problem
Over 29% of world's coke is made in China. Recently market liberalization has lead to town and village enterprises, with uncertainty in future markets resulting in short-sighted resource use. There are currently many small cokemaking plants with relatively primitive technology. This has resulted in an industry with low transportation costs (as coke is supplied by many small local producers) but high pollution and energy use.
Figure 1 Coke from en.wikipedia.org/wiki/Image:Koks_Brennstoff.jpg
The government wants to move cokemaking to Shanxi, where they can establish bigger facilities. This plan will be more efficient, with less pollution, but will also result in higher transport costs (calculated from a GIS database). The plants in Shanxi will be built with one or more oven batteries, each making 75,000 tonnes of coke a year. The process these plants will use to convert coal to coke is "thermal decomposition". This process results in 1 tonne of coke produced for every 1.3 tonnes of coal processed.
The (simplified) problem we will model has the following details:
- There are six coal mines, each able to supply up to a certain amount of coal each year to the plants for processing
- There are six customers, each with a certain demand for coke each year
- There are six possible plant locations, each able to process a certain amount of coke each year
Each plant has 6 possible sizes, with coke processing levels and associated construction costs shown below:
Size |
Cost |
(kT/yr) |
(MRMB) |
75 |
4.4 |
150 |
7.4 |
225 |
10.5 |
300 |
13.5 |
375 |
16.5 |
450 |
19.6 |
Each Mine has the following coal supply per year:
Mine |
1 |
2 |
3 |
4 |
5 |
6 |
Coal Supply (kT/yr) |
25.8 |
728 |
1456 |
40 |
36.9 |
1100 |
Each Customer has the following coke demand per year:
Customer |
1 |
2 |
3 |
4 |
5 |
6 |
Coke Demand (kT/yr) |
83 |
5.5 |
6.975 |
5.5 |
720.75 |
5.5 |
The transportation costs (RMB/kT) between the mines and the
plants are as follows:
RMB/kT |
Plant 1 |
Plant 2 |
Plant 3 |
Plant 4 |
Plant 5 |
Plant 6 |
Mine 1 |
231737 |
46813 |
79337 |
195845 |
103445 |
45186 |
Mine 2 |
179622 |
267996 |
117602 |
200298 |
128184 |
49046 |
Mine 3 |
45170 |
93159 |
156241 |
218655 |
103802 |
119616 |
Mine 4 |
149925 |
254305 |
76423 |
123534 |
151784 |
104081 |
Mine 5 |
152301 |
205126 |
24321 |
66187 |
195559 |
88979 |
Mine 6 |
223934 |
132391 |
51004 |
122329 |
222927 |
54357 |
The transportation costs (RMB/kT) between the plants and the customers are as follows:
RMB/kT |
Plant 1 |
Plant 2 |
Plant 3 |
Plant 4 |
Plant 5 |
Plant 6 |
Customer 1 |
6736 |
42658 |
70414 |
45170 |
184679 |
111569 |
Customer 2 |
217266 |
227190 |
249640 |
203029 |
153531 |
117487 |
Customer 3 |
35936 |
28768 |
126316 |
2498 |
130317 |
74034 |
Customer 4 |
73446 |
52077 |
108368 |
75011 |
49827 |
62850 |
Customer 5 |
174664 |
177461 |
151589 |
153300 |
59916 |
135162 |
Customer 6 |
186302 |
189099 |
147026 |
164938 |
149836 |
286307 |
Return to top
Problem Formulation
The formulation...
Return to top
Computational Model
The computational model...
Return to top
Results
The results...
Return to top
Conclusions
In conclusion...
Return to top
Extra for Experts
This problem is similar to the Cosmic Computers Problem, but the facility location is a little different. Rather than face a decision about whether to build a plant or not, we need to determine what type of plant to build. This gives rise to the following variable:
While solving the Coke Supply Chain Problem, the expression
will often be fractional. This means that the capacity of the plant
where is the capacity of a plant of size will be between the capacities of two different size plants, e.g., 280 kT/yr is between 225 kT/yr plant and a 300 kT/yr plant. We could use constraints to remove the fractionality, e.g.,
These branches will ensure plants have the right capacities, but will still not resolve fractionalities in the . However, if we want the capacity of plant to be 225, then we can remove all the that allow for the capacity to be larger than 225:
Conversely, if we want to branch up, i.e., the capacity is 300, then we can remove all the that allow the capacity to be smaller than 300:
Note For these branches to work properly, the possibility of building no plant must be modelled as building a plant with no capacity (i.e., = 0) for no cost.
Return to top
Student Tasks
- Write AMPL model, data and script files (
coke.mod , coke.dat and coke.run respectively) to solve the Coke Production Problem. Write a management summary for your solution.
What to hand in Your 3 AMPL files. Your management summary.
- Experts Only Solve the LP relaxation of the Coke Supply Chain Problem integer programme. Using the branches described in Extra for Experts, use AMPL to perform branching on at least 4 nodes and draw the resulting branch-and-bound tree.
Hint See Extra for Experts in the Cosmic ComputersProblem for an example of constraint branching in AMPL.
What to hand in Your AMPL code for implementing the branches. Your drawing of your branch-and-bound tree.
Return to top
|*FORM FIELD ProblemDescription*|ProblemDescription|*THE COKE PRODUCTION PROBLEM*
Adapted from a real-world problem
Over 29% of world’s coke is made in China. Recently market liberalization has lead to town and village enterprises, with uncertainty in future markets resulting in short-sighted resource use. There are currently many small cokemaking plants with relatively primitive technology. This has resulted in an industry with low transportation costs (as coke is supplied by many small local producers) but high pollution and energy use.
Coke Link to reference en.wikipedia.org/wiki/Image:Koks_Brennstoff.jpg
The government wants to move cokemaking to Shanxi, where they can establish bigger facilities. This plan will be more efficient, with less pollution, but will also result in higher transport costs (calculated from a GIS database). The plants in Shanxi will be built with one or more oven batteries, each making 75,000 tonnes of coke a year. The process these plants will use to convert coal to coke is "thermal decomposition". This process results in 1 tonne of coke produced for every 1.3 tonnes of coal processed.
The (simplified) problem we will model has the following details:
- There are six coal mines, each able to supply up to a certain amount of coal each year to the plants for processing
- There are six customers, each with a certain demand for coke each year
- There are six possible plant locations, each able to process a certain amount of coke each year
Each plant has 6 possible sizes, with coke processing levels and
associated construction costs shown below:
Size |
Cost |
(kT/yr) |
(MRMB) |
75 |
4.4 |
150 |
7.4 |
225 |
10.5 |
300 |
13.5 |
375 |
16.5 |
450 |
19.6 |
Each Mine has the following coal supply per year:
Mine |
1 |
2 |
3 |
4 |
5 |
6 |
Coal Supply (kT/yr) |
25.8 |
728 |
1456 |
40 |
36.9 |
1100 |
Each Customer has the following coke demand per year:
Customer |
1 |
2 |
3 |
4 |
5 |
6 |
Coke Demand (kT/yr) |
83 |
5.5 |
6.975 |
5.5 |
720.75 |
5.5 |
The transportation costs (RMB/kT) between the mines and the
plants are as follows:
RMB/kT |
Plant 1 |
Plant 2 |
Plant 3 |
Plant 4 |
Plant 5 |
Plant 6 |
Mine 1 |
231737 |
46813 |
79337 |
195845 |
103445 |
45186 |
Mine 2 |
179622 |
267996 |
117602 |
200298 |
128184 |
49046 |
Mine 3 |
45170 |
93159 |
156241 |
218655 |
103802 |
119616 |
Mine 4 |
149925 |
254305 |
76423 |
123534 |
151784 |
104081 |
Mine 5 |
152301 |
205126 |
24321 |
66187 |
195559 |
88979 |
Mine 6 |
223934 |
132391 |
51004 |
122329 |
222927 |
54357 |
The transportation costs (RMB/kT) between the plants and the
customers are as follows:
RMB/kT |
Plant 1 |
Plant 2 |
Plant 3 |
Plant 4 |
Plant 5 |
Plant 6 |
Customer 1 |
6736 |
42658 |
70414 |
45170 |
184679 |
111569 |
Customer 2 |
217266 |
227190 |
249640 |
203029 |
153531 |
117487 |
Customer 3 |
35936 |
28768 |
126316 |
2498 |
130317 |
74034 |
Customer 4 |
73446 |
52077 |
108368 |
75011 |
49827 |
62850 |
Customer 5 |
174664 |
177461 |
151589 |
153300 |
59916 |
135162 |
Customer 6 |
186302 |
189099 |
147026 |
164938 |
149836 |
286307 |
|
FORM FIELD ProblemFormulation |
ProblemFormulation |
The formulation... |
FORM FIELD ComputationalModel |
ComputationalModel |
The computational model... |
FORM FIELD Results |
Results |
The results... |
FORM FIELD Conclusions |
Conclusions |
In conclusion... |