CaseStudyForm
Title The Winstone Aggregates Problem
DateSubmitted 10 Mar 2008
CaseStudyType DIYCaseStudy
OperationsResearchTopics LinearProgramming, BlendingModels
ApplicationAreas

ProblemDescription Winstone Aggregates NZ is New Zealand's largest aggregate company. They operate 12 hard rock quarries throughout New Zealand along with Sand Plants, Gravel and Shingle Plants and a Scoria Pit. The aggregates produced by Winstones are used in the construction of roads and buildings. In 1997 Winstone Aggregates approached the Department of Engineering Science (University of Auckland) to help with strategic planning for the closure of the Lunn Ave Quarry in Mt Wellington.

The original model devised by Department of Engineering Science researchers was written in GAMS (General Algebraic Modeling language), and solved using MINOS.

Winstones take Sand, Scoria, Basalt and Greywacke from their quarries and mix these to produce several different types of aggregate:

The amount of each raw material available is limited as the Resource Consent Act controls the extraction of the raw materials from the quarries.

ProblemFormulation The formulation...
ComputationalModel The computational model...
Results The results...
Conclusions In conclusion...
ExtraForExperts

StudentTasks

Edit | Attach | Watch | Print version | History: r3 < r2 < r1 | Backlinks | View topic | Raw edit | More topic actions...
Topic revision: r1 - 2008-03-09 - MichaelOSullivan
 
  • Edit
  • Attach
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2025 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback