Case Study: The Winstone Aggregates Problem

Submitted: 10 Mar 2008

Operations Research Topics: LinearProgramming, BlendingModels

Application Areas: Aggregate Manufacturing

Contents

Problem Description

Winstone Aggregates NZ is New Zealand's largest aggregate company. They operate 12 hard rock quarries throughout New Zealand along with Sand Plants, Gravel and Shingle Plants and a Scoria Pit. The aggregates produced by Winstones are used in the construction of roads and buildings. In 1997 Winstone Aggregates approached the Department of Engineering Science (University of Auckland) to help with strategic planning for the closure of the Lunn Ave Quarry in Mt Wellington.

The original model devised by Department of Engineering Science researchers was written in GAMS (General Algebraic Modeling language), and solved using MINOS.

Winstones take Sand, Scoria, Basalt and Greywacke from their quarries and mix these to produce several different types of aggregate:

  • Coarse
  • Fines
  • LowBase
  • HighBase
  • Sand
  • Scalpings
  • Scoria
  • Sealchips

winstones_1.jpg

The amount of each raw material available is limited as the Resource Consent Act controls the extraction of the raw materials from the quarries.

Raw materials may also undergo intermediate processing, e.g., rocks extracted as large boulders must be crushed and then "screened" at the processing plant, before being "mixed" into aggregates.

winstones_2.jpg

Winstone Aggregates wants to maximise the profit it receives to determine the best use of its raw materials, but it has to consider factors such as

  • the demand for different aggregates varies during the year;
  • stockpiling product costs money, i.e., the holding cost;
  • each aggregate is made according to a recipe that defines how it is produced from the raw materials;
  • transportation costs from quarries to customer must be incorporated.

For this case study, we will consider a smaller problem from Winstone Aggregates. They have extracted 40 tonnes of Scoria and 20 tonnes of Greywacke. They can use these raw materials to produce Fines, HighBase and Coarse aggregates. The recipe and sale price for the aggregates is given in Table 1.

Table 1 Aggregate recipes and prices

Recipe (per tonne) Scoria (tonnes) Greywacke (tonnes) Sale Price ($/tonne)
Fines 0.6 0.9 70
HighBase 0.5 0.7 60
Coarse 1.2 0.3 40

Winstones want to find the best production plan for their supply of raw materials.

Return to top

Student Tasks

1. Write AMPL files winstones.mod, winstones.dat and winstones.run to find a production plan. Write a management summary of your production plan.

What to hand in Your AMPL files winstones.mod, winstones.dat and winstones.run. Your management summary.

Return to top

Edit | Attach | Watch | Print version | History: r3 < r2 < r1 | Backlinks | Raw View | Raw edit | More topic actions
Topic revision: r3 - 2008-04-02 - MichaelOSullivan
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback