Case Study: The American Steel Planning Problem
Submitted: 30 Apr 2008
Application Areas: Logistics
Contents
Problem Description
American Steel, an Ohio-based steel manufacturing company, produces steel at its two steel mills located at Youngstown and Pittsburgh. The company distributes finished steel to its retail customers through the distribution network of regional and field warehouses shown below:
The network represents shipment of finished steel from American Steel's two steel mills located at Youngstown (node 1) and Pittsburgh (node 2) to their field warehouses at Albany, Houston, Tempe, and Gary (nodes 6, 7, 8 and 9) through three regional warehouses located at Cincinnati, Kansas City, and Chicago (nodes 3, 4 and 5). Also, some field warehouses can be directly supplied from the steel mills.
Table 1 presents the minimum and maximum flow amounts of steel that may be shipped between different cities along with the
cost per 1000 ton/month of shipping the steel. For example, the shipment from Youngstown to Kansas City is contracted out to a railroad company with a minimal shipping clause of 1000 tons/month. However, the railroad cannot ship more then 5000 tons/month due the shortage of rail cars.
Table 1 Arc Costs and Limits
From node |
To node |
Cost |
Minimum |
Maximum |
Youngstown |
Albany |
500 |
- |
1000 |
Youngstown |
Cincinnati |
350 |
- |
3000 |
Youngstown |
Kansas City |
450 |
1000 |
5000 |
Youngstown |
Chicago |
375 |
- |
5000 |
Pittsburgh |
Cincinnati |
350 |
- |
2000 |
Pittsburgh |
Kansas City |
450 |
2000 |
3000 |
Pittsburgh |
Chicago |
400 |
- |
4000 |
Pittsburgh |
Gary |
450 |
- |
2000 |
Cincinnati |
Albany |
350 |
1000 |
5000 |
Cincinnati |
Houston |
550 |
- |
6000 |
Kansas City |
Houston |
375 |
- |
4000 |
Kansas City |
Tempe |
650 |
- |
4000 |
Chicago |
Tempe |
600 |
- |
2000 |
Chicago |
Gary |
120 |
- |
4000 |
The current monthly demand at American Steel's four field warehouses is shown in
Table 2.
Table 2 Monthly Demands
Field Warehouses |
Monthly Demand |
Albany, N.Y. |
3000 |
Houston |
7000 |
Tempe |
4000 |
Gary |
6000 |
The Youngstown and Pittsburgh mills can produce up to 10,000 tons and 15,000 tons of steel per month, respectively. The management wants to know the least cost monthly shipment plan.
Return to top
Problem Formulation
The formulation...
Return to top
Computational Model
The computational model...
Return to top
Results
The results...
Return to top
Conclusions
In conclusion...
Return to top
- steel_network.jpg: